Pump repair having concluded, the SRC Leisure Pool has been reopened. All aquatic programs have returned to normal operation.
“With strong credit to our staff for identifying there was a problem, this was really an outstanding response from the Plumbing shop and Zone 6. An all-around team effort from great colleagues,” said Andrew Darling, Director, Campus Recreation.
For more information visit the SRC Leisure Pool page on the Campus Recreation website.